Infrastructure - Yard
Our yard is located in Lobito’s bay which is 500 km south of Luanda, in the Benguela province. It is next to the Lobito Port, one of the most important ports of the West African coast, because of its extension and depth.
The yard is spread over an area of 80 hectares with 12,000 m² of workshops including 4 white workshops of 4,700 m² and two quays.
QUAY YARD 1
Available length: 180 m
Quayside level: LAT+2,9 m
Water depth: LAT-10 m
Max high-tide: LAT+2 m
Bollard capacity: 30 mT
Max loadout capacity:
5,500mT for skidded load out
(27m between skid ways)
2,500mT for load out with cranes.
QUAY YARD 2
Available length: 143 m
Quayside level: LAT+3,3 m
Water depth: LAT-10 m
Max high-tide: LAT+2 m
Bollard capacity: 30 mT
Max loadout capacity:
6,000mT for skidded load out
(21.3m between skid ways).
BLACK WORKSHOPS & ASSEMBLY LINES
- 2-off Black Workshops with an overall area of 2,450 m²
- 1-off Bracing assembly line with a profile cutting (CNC) machine
- Suction Anchors & Piles assembly, lines with dedicated rolling machines,
- Dedicated assembly line for Jacket legs, and piles assembly
- 3-off oxy-cutting (CNC) machines and 1-off beam cutting machine.
FINAL ERECTION AREAS
- 2-off areas of 70,000 m² each dedicated to assembly of massive/wide structures
- Each area has a direct access to their dedicated quay by skidding or through crawler cranes
- Ground bearing capacity above 50 mT/m² everywhere on the erection areas to ensure safe erection activities including crawling with heavy crawler cranes
FABRICATION CAPACITY
- Capacity to erect the small bore piping on 7 Manifolds simultaneously.
- Capacity to weld all type of stainless steel from 316L to Super Duplex.
- Excellent experience and capacity in FAT with 3 manifolds tested simultaneously.
- 3 Rolling machines that are dedicated for rolling suction anchors cans.
CLIENT SERVICES
We provide all the required client services such as:
- Capacity to erect the small bore piping on 7 Manifolds simultaneously.
- Capacity to weld all type of stainless steel from 316L to Super Duplex.
- Excellent experience and capacity in FAT with 3 manifolds tested simultaneously.
- 3 Rolling machines that are dedicated for rolling suction anchors cans.